Wednesday, October 12, 2011

Progress, Progress

Another week has flown by......Here's what I've been doing:

1- SBS #13- String Block: It's my first time using paper foundation.  I really had fun with this one.  Next time I'm going to make the sections thinner, but it's kind of cool that it's asymmetrical.

2- Diamond Chains Quilt:  Well, it was supposed to be done yesterday, but luckily, Melinda was nice enough to extend the date.  The former deadline scared me into action and I quilted it.  I really felt like I wanted the quilting to be as scarce as possible and let the design shine through, so I outlined the star and did a lot of diagonal lines connecting the diamonds.
Front
Back - I don't know how well you can see it
3-  Country Threads Quilt along: Here's the front and back -



You'll notice the black is a bunch of Treble Clefs.  I chose this fabric, because my Grad adviser recently had a little boy (I have a Masters in Music Education).  It's my little way of personalizing the quilt.

Stats for the Week:

New projects - 0
Completed projects - 0
In Progress - 4
Other projects with no progress- 3 (same as before)

Check out the other WIP at Freshly Pieced!

7 comments:

  1. Okay, number 1: can I say again how much I love your Diamond Chains quilt? Uber love! I had the same problem getting a good photo of the quilting, but I can see yours and I love how it turned out. Also, I was a music person as well! I was minoring in music until I changed colleges to get a speech pathology degree and the music went out the window! Things in common!

    ReplyDelete
  2. I don't know which quilt I like better, they are both so nice!

    ReplyDelete
  3. Hey, your diamond chains quilt is really coming along! It looks fantastic. :D

    ReplyDelete
  4. Cute! I love the idea of using the treble fabric! Everything looks awesome :)

    ReplyDelete
  5. Everything is wonderful...even the little men

    ReplyDelete
  6. I love the colors of their work .. their little adorable!!!

    ReplyDelete

I love hearing from you! :)